The historic Nebelhorn cable car embarked on its maiden voyage on a balmy summer day in June 1930 and is still considered one of the longest passenger cable cars in the world. Over 90 years later, a new chapter begins for this stalwart of German cable cars – its official and well-deserved retirement. Starting next season, a new 10-person gondola lift will transport outdoor enthusiasts to the mountain bliss of the Nebelhorn. The project is being realized with an investment of approximately 55 million euros.

3. Plenty of Space and Greater Comfort

Construction work on the Nebelhorn in Oberstdorf began in the summer of 2019. The modernization of the gondola lift includes barrier-free access, a new valley and mid-station, and an expanded summit station. Comfort is paramount. Seating for every passenger ensures a scenic ride, while the new mid-station eliminates the need to change lifts – thanks to reduced waiting times, passengers can continue comfortably towards the summit. The Seealpe station will continue to welcome passengers for boarding and alighting, making excursions to the Seealpe.

Overview of measures

The overall project "Optimization of Scheidtobel Fellhorn" integrates measures from the areas of lift and facility construction, as well as slope construction and snowmaking. Here is a brief overview of the planned measures and the associated permitting processes:

Fellhorn Sessellift Fellhorn Sessellift
Lifts & Systems
Lifts & Systems
  • New Scheidtobel cable car

** Simultaneous dismantling of the Bierenwang cable car

  • New "Swisscord" lift as an access lift to the valley run

Good to know:

  • Overall transport capacity remains the same
  • The number of people on the most popular slopes at Scheidtobel will even decrease
Mama hinterher Mama hinterher
slopes
slopes

Blue Ring - More "free passage" for everyone

  • Make all lifts accessible (also) via blue runs:

** More fun on the slopes thanks to the choice of routes
** More safety for experienced and less experienced skiers

Slope widening at Bierenwang & Walsergund

  • Dismantling of the "Stadelmann" metal structure
  • Crossing of the ravine via a natural stone ford
Außendienst bei der Arbeit Außendienst bei der Arbeit
Snowmaking
Snowmaking
  • Construction of a new reservoir for snowmaking
    • Evidence of a birch mouse population
    • Development of a model project for relocating the birch mouse
  • Expansion as a natural reservoir (model project)
    • Preliminary relocation of the birch mouse
Baustelle Nebelhorn Baustelle Nebelhorn
Applications & Permits
Applications & Permits

The overall project is divided into various approval processes and building applications, including:

  • Construction and operating permit for the Scheidtobel cable car
  • Building application for ski slope construction
  • Water rights application for the reservoir
  • Construction and operating permit for Swisscord
2019
Beiträge aus dem Q1 2019
Beiträge aus dem Q2 2019
Beiträge aus dem Q3 2019
Beiträge aus dem Q4 2019
1. Scoping Meeting | Planning of the Reservoir
1. Scoping Meeting | Planning of the Reservoir
Voting date | Planning reservoir
2020
Beiträge aus dem Q1 2020
Beiträge aus dem Q2 2020
Beiträge aus dem Q3 2020
Beiträge aus dem Q4 2020
Information session for associations | Planning for the Fellhorn reservoir
Information session for associations | Planning for the Fellhorn reservoir
Information session on Environment & Nature Conservation
2021
Beiträge aus dem Q1 2021
Beiträge aus dem Q2 2021
Beiträge aus dem Q3 2021
Beiträge aus dem Q4 2021
Information session Lower Nature Conservation Authority
2025
Beiträge aus dem Q1 2025
Beiträge aus dem Q2 2025
Beiträge aus dem Q3 2025
Submission of Masterplan Scheidtobel Fellhorn
09/30/2025
Submission of Masterplan Scheidtobel Fellhorn

To provide all participating permitting authorities and associations with a comprehensive overview of the planned individual measures, a "Master Plan" was created as a summary of all individual measures.

This Master Plan illustrates the interaction and mutual interdependencies of the measures.

This Master Plan was submitted on September 30, 2025, along with various individual applications, and includes the following sub-measures:

- Creation of the "Blue Ring" as a cohesive piste concept

- Application for a construction and operating permit for the Scheidtobel cable car, including piste construction

- Swisscord lift as an access lift to the Walsergund/valley run

- Construction of the Bierenwang piste

- Water rights application for the Walsergund run channel

- Optimization of the snowmaking system

- Construction of a new natural reservoir

07/15/2021
Information session Lower Nature Conservation Authority
12/15/2020
Information session on Environment & Nature Conservation

An information meeting with the government of Swabia (RvS), the State Office for the Environment (LfU) and the lower nature conservation authority (UNB).

07/15/2020
Information session for associations | Planning for the Fellhorn reservoir

During this information session, the regional associations were informed about the current status of the survey of the forest birch mouse population and the planned further procedure in the context of "new reservoir construction".

12/01/2019
Voting date | Planning reservoir

During the preliminary planning for the construction of a new reservoir, a population of birch mice was discovered in the Scheidtobel area.

At this coordination meeting with the district office, the options for further action were on the agenda:

- Examination of 10 alternative locations

- Consultation with an expert on birch mice

05/15/2019
1. Scoping Meeting | Planning of the Reservoir

In May 2019, the first scoping meeting to prepare the building permit application took place: the project was presented to the district office (LRA) with all relevant associations.

A scoping meeting is a discussion between the client – in this case, the Oberstdorf Kleinwalsertal cable car company – the responsible permitting authority, and the relevant specialist agencies to determine the scope and type of documents to be submitted.

load old articles
Website
  • Deutschland
  • United States / GB
  • Nederlands
Wir verwenden Cookies
Wir und unsere Partner verwenden Cookies und vergleichbare Technologien, um unsere Webseite optimal zu gestalten und fortlaufend zu verbessern. Dabei können personenbezogene Daten wie Browserinformationen erfasst und analysiert werden. Durch Klicken auf „Alle akzeptieren“ stimmen Sie der Verwendung zu. Durch Klicken auf „Einstellungen“ können Sie eine individuelle Auswahl treffen und erteilte Einwilligungen für die Zukunft widerrufen. Weitere Informationen erhalten Sie in unserer Datenschutzerklärung.
Einstellungen  ·  Datenschutzerklärung  ·  Impressum
zurück
Cookie-Einstellungen
Cookies die für den Betrieb der Webseite unbedingt notwendig sind. weitere Details
Website
Verwendungszweck:

Unbedingt erforderliche Cookies gewährleisten Funktionen, ohne die Sie unsere Webseite nicht wie vorgesehen nutzen können. Das Cookie »TraminoCartSession« dient zur Speicherung des Warenkorbs und der Gefällt-mir Angaben auf dieser Website. Das Cookie »TraminoSession« dient zur Speicherung einer Usersitzung, falls eine vorhanden ist. Das Cookie »Consent« dient zur Speicherung Ihrer Entscheidung hinsichtlich der Verwendung der Cookies. Diese Cookies werden von OBERSTDORF KLEINWALSERTAL Bergbahnen auf Basis des eingestezten Redaktionssystems angeboten. Die Cookies werden bis zu 1 Jahr gespeichert.

Cookies die wir benötigen um den Aufenthalt auf unserer Seite noch besser zugestalten. weitere Details
Google Tag Manager
Verwendungszweck:

Einbindung von Google Analytics über den Google Tag Manager. Cookies von Google für die Generierung statischer Daten zur Analyse des Website-Verhaltens.
Anbieter: Google LLC (Vereinigte Staaten von Amerika)
Verwendete Technologien: Cookies
Datenschutzhinweise: https://policies.google.com/privacy?fg=1

MMC: Allgemeines Tracking Clubseite
Facebook Pixel
Verwendungszweck:

Eine Tracking-Technologie, welche von Facebook und Facebook-Diensten verwendet wird.
Verwendete Technologien: Cookies
Datenschutzhinweise: https://de-de.facebook.com/privacy/explanation

Onlim Chatprogramm
Verwendungszweck:

Chatprogramm von Onlim. Ermöglicht dem Besucher einen Chat auf der Webseite.
Anbieter: Onlim GmbH (Österreich)

Verwendete Technologien: Cookies
Datenschutzhinweise: https://onlim.com/datenschutzerklaerung/

The Trade Desk Websitepixel
Verwendungszweck:

Auf dieser Website werden mit der Technologie von The Trade Desk (TheTrade Desk Ltd, 1 Bartholomew Close, London EC1A 7BL, United Kingdom,  https://www.thetradedesk.com/) Daten zu Marketing- und Optimierungszwecken gesammelt und gespeichert. Aus diesen Daten können unter anderem pseudonymisierte Nutzerprofile erstellt werden. Hierzu können Browser-Cookies eingesetzt werden. Die mit der Technologie von The Trade Desk erhobenen Daten werden seitens The Trade Desk nicht dazu benutzt, den Besucher dieser Website persönlich zu identifizieren. Der Datenerhebung und -speicherung kann jederzeit mit Wirkung für die Zukunft hier widersprochen werden. Weitere Informationen zum Datenschutz von The Trade Desk finden Sie hier

Externe Videodienste
Verwendungszweck:

Cookies die benötigt werden um YouTube Videos auf der Webseite zu integrieren und vom Benutzer abgespielt werden können.
Anbieter: Google LLC
Verwendte Technologien: Cookies
Ablaufzeit: Die Cookies werden bis zu 179 Tage gespeichert.
Datenschutzerklärung: https://policies.google.com/privacy?hl=de&gl=de

Cookies die benötigt werden um Vimeo Videos auf der Webseite zu integrieren und vom Benutzer abgespielt werden können.
Anbieter: Vimeo LLC
Verwendte Technologien: Cookies
Ablaufzeit: Die Cookies werden bis zu 1 Jahr gespeichert.

Datenschutzerklärung: https://vimeo.com/privacy